Wall by wall, coat by coat.
Painting jobs written up the way they were done: substrate, prep, sheen, coats, recoat windows and VOC load, with colour notes for every shade used.
Tap a chip to see the walls painted in it
Wall projects
Colour notes
Prep guides
Stripping is only necessary when the existing film is failing. Where it is sound, sanding and painting over it is faster and more durable. The decision is a physical te…
8 September 2026Prep Guide: First Coat on New PlasterboardNew plasterboard does not need a primer, but it does need three specific things fixed before the first coat or they will show for the life of the wall: proud taper join…
About this notebook
Every entry is a job that was actually done: substrate and prep first, then coats, sheen, recoat window and VOC load. Colour notes carry undertone, LRV and pairings — no marketing language.